The new HOA sign has now been installed following the completion of the new posts and the flower box beneath it—thanks to the group of volunteers who handled this project, as mentioned in an earlier update.

Pump House #2 is also looking great thanks to Workman’s Airpark resident Jon Brown of J & L Home Renewal, who generously completed the refurbishment as a neighbor helping the HOA. The south and east walls were in poor condition and required new siding. John also removed and reinstalled the antenna, added new inspection access panels, treated all exterior walls and the roof, installed new doors, and finished everything with fresh primer and paint.

The result is a much-improved, clean, and well-maintained pump house that benefits the entire community.

New HOA sign now installed
The siding was in poor condition and way past it’s prime
A worker conducting a roof inspection to confirm its condition
The installation of the new fasteners received careful, detailed attention.
Jon with the new access panels now allows inspection without the removal of the entire wall
Jon stands beside the newly restored pump house, now finished with fresh primer and paint.
Posted in

One response to “New HOA Sign Installed and Backup Well Pump House Renovated”

  1. .. Avatar
    ..

    Great Job. Thank you.

    Liked by 1 person

Leave a reply to .. Cancel reply